Application of Staged Sand Filling Fracturing Technology in Horizontal Shale Oil Wells with Deformed Casings
-
摘要: 针对井筒满足承压要求,但由于套管变形不能下入常规压裂工具进行分段压裂的页岩油水平井,通过极限填砂形成缝内砂塞,实现对已压裂层段的有效封隔,采用水平井填砂分段压裂技术进行分段压裂。为了不增加新的设备,研究形成了“尾追填砂”和“吹填缝口”2种填砂模式。长庆油田在华H40平台进行了页岩油套变水平井填砂分段压裂试验,累计填砂压裂8段,各段破裂压力均不一样,封堵效果可靠,施工成功率100%。现场试验结果表明,以“尾追填砂”填砂模式为主、“吹填缝口”填砂模式为辅,可以形成缝内砂塞,有效分隔已压裂层段,实现套变页岩油水平井的分段压裂,解决常规压裂工具无法下入的问题。Abstract: In some horizontal shale oil wells, the wellbore can meet the pressure-bearing requirement, but conventional fracturing tools fails to run in them due to casing deformation. To effectively pack the fractured intervals, the technology of staged sand filling fracturing in horizontal wells was adopted and extreme sand filling was used to form sand plugs in the fractures. Two sand filling modes, which included tail sand filling and fracture blowing, were formed to avoid introducing new equipments. In the Platform Hua H40 of the Changqing Oilfield, tests of staged sand filling fracturing were conducted in the horizontal shale oil wells with deformed casings. Eight stages were fractured by sand filling and the fracturing pressure varied at each stage, with good plugging results and a successful treatment operation rate of 100%. The field results demonstrate that sand filling is dominated by tail sand filling and assisted by fracture blowing, and sand plugs in the fractures can be formed to effectively isolate the fractured intervals. Finally, the staged fracturing of horizontal shale oil wells with deformed casings can be achieved, thereby solving the failure of running conventional fracturing tools.
-
表 1 试验井填砂分段压裂施工参数
Table 1. Construction parameters of staged sand filling fracturing in the test wells
层段 施工排量/
(m3·min–1)油压/MPa 套压/MPa 加砂量/
m3液量/
m3破裂 工作 停泵 破裂 工作 停泵 13 6.0 44.9 27.2 13.9 22.3 26.3 16.1 80.0 708.1 14 6.0 59.0 24.5 13.6 35.9 23.1 15.7 80.0 694.5 15 6.0 56.1 38.6 15.4 44.6 24.9 16.3 80.0 682.9 16 6.0 43.2 36.4 20.4 25.2 27.0 15.9 80.0 694.6 17 6.0 38.4 42.1 14.6 32.4 31.4 17.4 80.0 689.1 18 6.0 45.3 33.6 11.6 37.4 22.6 13.8 80.0 691.9 19 6.0 39.4 36.4 14.9 35.7 25.1 16.6 80.0 668.6 20 6.0 63.2 26.8 16.0 46.4 25.7 17.0 80.0 673.2 -
[1] 赵春艳,王波,罗垚,等. 页岩油套管变形水平井暂堵分段压裂工艺[J]. 断块油气田,2020,27(6):715–718.ZHAO Chunyan, WANG Bo, LUO Yao, et al. Temporary plugging and staged fracturing technology for casing deformation section in horizontal shale oil wells[J]. Fault-Block Oil & Gas Field, 2020, 27(6): 715–718. [2] 李军龙,李德旗,朱炬辉,等. 复杂页岩气井无限级砂塞分段压裂先导性试验[J]. 石油钻采工艺,2017,39(5):633–637.LI Junlong, LI Deqi, ZHU Juhui, et al. Pilot test on in fi nite-order sand plug staged fracturing of complex shale gas wells[J]. Oil Drilling & Production technology, 2017, 39(5): 633–637. [3] 梁兴,朱炬辉,石孝志,等. 缝内填砂暂堵分段体积压裂技术在页岩气水平井中的应用[J]. 天然气工业,2017,37(1):82–89. doi: 10.3787/j.issn.1000-0976.2017.01.010LIANG Xing, ZHU Juhui, SHI Xiaozhi, et al. Staged fracturing of horizontal shale gas wells with temporary plugging by sand fill-ing[J]. Natural Gas Industry, 2017, 37(1): 82–89. doi: 10.3787/j.issn.1000-0976.2017.01.010 [4] 董大忠,王玉满,李新景,等. 中国页岩气勘探开发新突破及发展前景思考[J]. 天然气工业,2016,36(1):19–32. doi: 10.3787/j.issn.1000-0976.2016.01.003DONG Dazhong, WANG Yuman, LI Xinjing, et al. Breakthrough and prospect of shale gas exploration and development in China[J]. Natural Gas Industry, 2016, 36(1): 19–32. doi: 10.3787/j.issn.1000-0976.2016.01.003 [5] 翁定为,雷群,胥云,等. 缝网压裂技术及其现场应用[J]. 石油学报,2011,32(2):280–284. doi: 10.7623/syxb201102013WENG Dingwei, LEI Qun, XU Yun, et al. Network fracturing techniques and its application in the field[J]. Acta Petrolei Sinica, 2011, 32(2): 280–284. doi: 10.7623/syxb201102013 [6] 夏海帮. 页岩气井双暂堵压裂技术研究与现场试验[J]. 石油钻探技术,2020,48(3):90–96.XIA Haibang. The research and field testing of dual temporary plugging fracturing technology for shale gas wells[J]. Petroleum Drilling Techniques, 2020, 48(3): 90–96. [7] 李德旗,何封,欧维宇,等. 页岩气水平井缝内砂塞分段工艺的增产机理[J]. 天然气工业,2018,38(1):56–66. doi: 10.3787/j.issn.1000-0976.2018.01.007LI Deqi, HE Feng, OU Weiyu, et al. Mechanism of multi-stage sand filling stimulation in horizontal shale gas well development[J]. Natural Gas Industry, 2018, 38(1): 56–66. doi: 10.3787/j.issn.1000-0976.2018.01.007 [8] 吴国涛,胥云,杨振周,等. 考虑支撑剂及其嵌入程度对支撑裂缝导流能力影响的数值模拟[J]. 天然气工业,2013,33(5):65–68.WU Guotao, XU Yun, YANG Zhenzhou, et al. Numerical simulation considering the impact of proppant and its embedment degree on fracture flow conductivity[J]. Natural Gas Industry, 2013, 33(5): 65–68. [9] 牛继磊,李根生,宋剑,等. 水力喷砂射孔参数实验研究[J]. 石油钻探技术,2003,31(2):14–16. doi: 10.3969/j.issn.1001-0890.2003.02.006NIU Jilei, LI Gensheng, SONG Jian, et al. An experimental study on abrasive water jet perforation parameters[J]. Petroleum Drilling Techniques, 2003, 31(2): 14–16. doi: 10.3969/j.issn.1001-0890.2003.02.006 [10] 姜勇,范登洲,付钢旦,等. 连续管填砂分层环空压裂技术[J]. 新疆石油天然气,2013,9(3):85–88. doi: 10.3969/j.issn.1673-2677.2013.03.018JIANG Yong, FAN Dengzhou, FU Gangdan, et al. The technology of layering sand-packed and annulus fracturing with coiled tub-ing[J]. Xinjiang Oil & Gas, 2013, 9(3): 85–88. doi: 10.3969/j.issn.1673-2677.2013.03.018 [11] 于东兵,胡强法,谭多鸿. 连续管喷砂射孔填砂环空压裂技术的发展现状[J]. 石油机械,2013,41(12):112–117.YU Dongbing, HU Qiangfa, TAN Duohong. Current situation of coiled tubing sandblast perforation sandpack annular fracture technology[J]. China Petroleum Machinery, 2013, 41(12): 112–117. [12] 曹欣. 水平井水力喷射填砂分段压裂技术在陇东油田应用[J]. 石化技术,2015,22(5):181, 183.CAO Xin. Application of staged fracturing technology in sand plug of horizontal well in Longdong oil field[J]. Petrochemical Industry Technology, 2015, 22(5): 181, 183. [13] 夏玉磊,杜焰,兰建平. 致密油水平井油管填砂分段压裂技术研究与应用[J]. 中国石油石化,2017(3):73–74.XIA Yulei, DU Yan, LAN Jianping. Research and application of tubing sand-filling sublevel fracturing technology in tight oil horizontal well[J]. China Petrochem, 2017(3): 73–74. -